Research
Research
Research and upgrade plan for higher beta and steady-state operation
2008
First plasm
(ECH 84 GHz)
2017
Long-pulseH-mode
(NBI~5.5 MW)
(ECH~1 MW)
Long-pulse H-mode research
- Long pulse H-mode (>70s)
- ELM research & control (>30s)
- Alternative operation modes (ITB, low q, ..)
2017
2022
Heating upgrade
(NBI~12 (10)MW)
(ECH~6(4) MW)
Advanced scenario & MHD research
-
Stable high beta operation
(bN >3.0, Tion~ 10 keV)
-
Advanced mode develop
(hybrid, ITB, low q)
-
MHD & disruption control
2022
Advanced current drive
(LHCD~4 MW)
(Helicon CD~4 MW)
2026~
Divertor upgrade
(Tungsten divertor)
(Detached divertor)
(Diagnostics)
Steady-state & reactor relevant research
- Tungsten divertor& active cooling
- Advanced current drive under test(HFS LHCD & Helicon CD)
- Steady-state operation (~300s)