본문으로 바로가기 주메뉴 바로가기
Research

Research

Research and upgrade plan for higher beta and steady-state operation

2008

First plasm

(ECH 84 GHz)

2017

Long-pulseH-mode

(NBI~5.5 MW)
(ECH~1 MW)

Long-pulse H-mode research

  • Long pulse H-mode (>70s)
  • ELM research & control (>30s)
  • Alternative operation modes (ITB, low q, ..)

2017

2022

Heating upgrade

(NBI~12 (10)MW)
(ECH~6(4) MW)

Advanced scenario & MHD research

  • Stable high beta operation

    (bN >3.0, Tion~ 10 keV)

  • Advanced mode develop

    (hybrid, ITB, low q)

  • MHD & disruption control

2022

Advanced current drive

(LHCD~4 MW)
(Helicon CD~4 MW)

2026~

Divertor upgrade

(Tungsten divertor)
(Detached divertor)
(Diagnostics)

Steady-state & reactor relevant research

  • Tungsten divertor& active cooling
  • Advanced current drive under test(HFS LHCD & Helicon CD)
  • Steady-state operation (~300s)
보안문자 이미지

보안문자를 입력 후 확인 버튼을 누르세요.